About the project
Powertech has carried out termination and testing of the HV cable systems as well as the high & low voltage protection testing works for SBM Singapore.
The work we have successfully completed include;
- HV Cable Termination and VLF Testing
- 1C x 185mm2 – 27 lengths
- 1C x 300mm2 – 60 lengths
- 3C x 50mm2 – 26 lengths
- 3C x 150mm2 – 8 lengths
- LV Switchboard
- MV Switchboard
- ABB Protection relays with 61850 and Goose programming
- ClientSBM, Singapore
- Start Date2020
- End Date2021